Hybrid Structural Systems
Multiple structural systems coordinated as one buildable project environment.
Skyline Design Group coordinates hybrid structural systems where steel, concrete, precast, masonry support, timber or light-gauge framing must meet cleanly across shared grids, levels and interface zones.
Request a scope reviewModel the structure around the decisions the team needs to make.
The goal is not to make the model visually dense. It is to make transitions, responsibilities and critical interfaces easy to review before those conditions become field decisions.


Make structural information easier to locate, review, coordinate and communicate.
What can be included in a hybrid structural systems scope.
Scope is aligned to the project milestone, required documentation, coordination responsibilities and the information available from the design team.
Steel-to-concrete transitions
Precast-to-steel interfaces
Masonry support conditions
Timber and light-gauge interfaces
Transfer levels and mixed framing zones
Shared openings and support zones
Structural geometry is useful when surrounding disciplines can act on it.
Skyline uses views, filters and issue-focused documentation to make critical interfaces visible to the teams responsible for resolving them.

Resolve the interface before it becomes a field decision.
One structural source. Multiple coordinated outputs.
The exact package is defined during scoping, but the structural model can support coordinated drawings, review views and project data without rebuilding the same information in disconnected places.
Federated structural model
Interface-zone plans
Transition sections and elevations
Coordination viewpoints
Issue and responsibility snapshots
Model-driven documentation
A controlled path from inputs to model issue.
The workflow keeps model content, drawing outputs, review comments and release status connected to a clear sequence.
Input audit
Review source files, levels, grids, standards, milestones and known information gaps.
Model build
Develop the structural system around agreed geometry, information and project uses.
Coordination + QA
Review interfaces, openings, views, tags, warnings and model-to-sheet consistency.
Controlled issue
Package approved models, drawings and exchange files with clear issue status.
Explore the other framing systems.
Send the current files. We’ll define the model path.
Share the current structural, architectural and coordination files, required deliverables and milestone dates. Skyline can define a practical BIM production scope around the information your team needs.


